Boiler Operations Section

Daily Operations Report

Use the Boiler Operations section of the Daily Operations Report to record information concerning Boiler use.

Each equipment operations section in the Daily Operations report appears as a multi-level spreadsheet. The highest level of the spreadsheet is automatically populated when a Rig is associated to an Event. The Rig's equipment is displayed depending on its individual installation and removal dates. Any boilers provided for the Rig which have not yet been removed will appear in the report.

The assoc_Boiler.gif button displays the Boiler Properties dialog used to add a new boiler to the Rig. The new information populates the Boiler spreadsheet and adds the boiler to the associated rig on the Contractors tab. If this button is not available, verify that a Rig Operation has been associated with the Event.

Boilers can also be added to the Rig using the File > New command. See the New Command topic for more information.

The assoc_rig.gif button enables the user to associate a Rig to the Event. This button is only available when a Rig is not currently associated to the Event. For more information, see the Associate Rig to Daily Wizard topic.

Click the addchldrow.gif button to add a sub-spreadsheet row in order to record information about the equipment operation.

Time

The Time column uses a time entry format. Click the hour, minute (use the up and down arrow keys to record the hours and minutes).

For information on using spreadsheets, see the Using Spreadsheets and Tables topic.

Associated Rig Equipment:

If equipment does not appear in the spreadsheet, verify that a Rig Operation has been associated with the Event.

To verify Rig Operations association, from the Wells tab in the Well Explorer, right-click on the Event and follow the menu path: Associate > Rig Operation... If a Rig Operation has already been associated with the Event, it will be identified in the Associate Rig Operation to Event dialog.

If the Event is associated with a Rig Operation and no equipment appears in the operation sections of the Daily Operations report, verify that equipment exists for the Rig by reviewing the Rig in the Contractors tab of the Well Explorer. Additionally, check that equipment installation dates occur before the Daily Operations report date. If an equipment removal date has been entered, ensure that it occurs after the Daily Operations report date. Equipment not installed on the report date is not displayed.