Tests Section
Cementing Report
The Tests section of the Cementing report is used to record the results of the cement job evaluation to ensure that the objectives of the cement job were achieved. Use this section to record the estimated top cement depth and the results of different tests performed to determine the quality of the cement bond between the borehole wall and the pipe.
Casing Test
A Casing pressure test is performed to test the isolation provided by the cement after a primary cement job. Pressure tests may also be performed after remedial cementing to record if perforations have been effectively sealed.
Cement Found check box
Activate the Cement Found check box if cement was found between the shoe and the float collar.
Log/Survey Evaluation
Activate check boxes to indicate which cement evaluation logs have been run and record the result of the cement job evaluation from each log.
Shoe Test
Formation Integrity Tests or Leak Off Tests are normally performed after the shoe has been drilled out before drilling starts on the next hole section. The FIT or LOT is performed to determine the strength of the wellbore below the shoe which is normally the weakest point of the next hole section.
Liner Top Test
Enter the results from either a positive or negative pressure test.
Shoetrack Cement
Enter the estimated measured and total vertical depths for the Shoetrack Cement tests.
Interpretation Survey
This area records the evaluation of the Cement top depth, how it was located and what method was used to determine this.